翻訳と辞書 |
HVDC Italy–Greece : ウィキペディア英語版 | HVDC Italy–Greece
The HVDC Italy–Greece is a monopolar submarine power cable link between Italy and Greece with a maximum transmission power of 500 megawatts. It went in service in 2001. The HVDC Italy–Greece begins in the static inverter plant Galatina situated at in Italy and is implemented in its first as underground cables. Then it crosses the Ionian Sea as a long submarine cable. It reaches shore just a few kilometres south of Albanian border at , where the long overhead line to Arachthos static inverter station situated at starts. The cathode is implemented as bare copper wire on the Italian site, the anode is installed in a bay in Greece at . ==Sites==
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「HVDC Italy–Greece」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|